 |
 |
 |
Daggett's Supervalu, Hinckley, MN. |
New frozen food cases installed at Daggett's in 2004. |
Daggetts' new produce
cases, 2005. |
 |
 |
 |
Meat cases at Daggett's. |
Deli Department at Daggetts. |
Compressor room - installed and maintained by Strandlund. |
 |
 |
 |
K&R Meats, Mora MN. Owners Ken & Rich pictured (left) with meat room equipment, and Rich Brent and Ken with the retail meat case installed by Strandlund's. |
Cambridge Sober School. Air makeup system. 2004 installation. |
 |
 |
 |
Munchkin boiler retrofit installation, 2004. |
Baxi boiler - new installation 2004. |
Hydro Shark electric boiler used with the sidewalk snow melt system below. |
 |
 |
 |
Mr. Pex Radiant Tubing used for snow melting application on steps and sidewalks. |
 |
 |
 |
Cambridge, Minnesota High School Kitchen Air Conditioning installation. Features a Carrier 38HDR Puron Ductless Air Conditioner. |
 |
 |
|
Mr. Pex Raidant in a staple up application using C-FIN plates.
|
Mr. Pex installation in a split-level home. |
|